mezate28
4 years ago @Edit 4 years ago
Just when you thought you have eluded the requirements pero I love how it required to draft gov’t actions on the energy sector considering the impact of the pandemic. Ngano wa ko gathink ani no? All I thought abt were the health and economic sector. Aw naa diay gamay energy sector re overloading transformers. Grabe sunuray gyud ang buto ug trippings.
latest #10
mezate28
4 years ago
Siguro at the onset, it all boiled down to a sense of humanity for me.
mezate28
4 years ago
However, the sense of humanity should be transformed into practical structures through which the principles are upheld
mezate28
4 years ago
In our psyche, we all are towards the sense of humanity but with different perspectives on how the practical structures should be built, we go against each other in attempt to refine these structures.
立即下載
SUSii ô_ô
4 years ago
unsay buhaton ana ninyo els if mag overload ang transformer? mao ng inyo i schedule ang brownout?
mezate28
4 years ago
If magbuto ang transformer kar, magbrownout kadiyot unya ishift ra na ang load to other transformers. Mao na mabalik ang kuryente. If di na kaya mashift ang uban load, mao na dugay ang brownouts sa uban kay kailangan pa to ilisan ang transformer.
SUSii ô_ô
4 years ago
ahhhh okay. pero naa moy gigamit ana na instrument sd para mabal-an hapit na ang limit sa transformer?
mezate28
4 years ago
For now, up to substation level pa nga transformers (big) ang mamonitor nga loading. Meaning ang transformer (small) kung asa nakaconnect ang balay, dili pa na sha monitored individually. Bale ang collective load ana nga mga transformers (small) ra ang indicative sa loading.
mezate28
4 years ago
Pareha ra na sa kuryente nga meter kar. Ang mamonitor ra kay ang total kuyente ra nga nagamit sa balay pero dili nimo mamonitor per outlet kay gasto kaayo pero on the way na dira. Medyo constrained lang tungod sa cost pero ngita pa ug way para makaya.
SUSii ô_ô
4 years ago
ohh okay mao diay from time to time naa ghapon mangabuto na transformer kay manual ghapon ang monitoring
mezate28
4 years ago
Yes yes. Mao na gipropose ang monitoring down to the distribution transformers. Pilot implementation pa hinuon, gitry pa sa heavily loaded transformers
back to top